Five Rivers Aviation LVK

Livermore, CA

This three-hangar expansion is the second phase of development for Five Rivers Aviation in Livermore. The new hangar group is designed to accommodate the largest corporate aircraft and has a unique removeable door head panel installation to raise the door height to 30’ if future code modifications allow for a non-foam suppression system for doors over 28’ high. The three-hangar group flanks the existing one and includes a new ramp and taxi lane that can also be used for the flanking hangar group to the west. JRMA maximized the hangar area to allow for a conventional sprinkler system and eliminate the need for perimeter fire walls, thus providing an economical and operations-based solution. The hangar group is also set up for future interior improvement areas as required by each incoming tenant.

Project Facts
Location: Livermore Municipal Airport (LVK), Livermore, CA
Completion: 2021 (Estimated)
Site Area: 5.58 AC
Total Building Area: 42,110 SF
Service Type: Architecture, Structural Engineering
Sustainability: CALGreen
Project Highlights
  • Unique removeable door head panel solution to allow for door height increase from 28’ to 30’ to comply with potential future code modifications.
  • 350'-wide multi-panel free-floating hangar door system for maximum aircraft access to hangar. 

Related Projects

Atlantic Aviation SLC

Atlantic Aviation SLC

Salt Lake City, UT

Aerolease Group Hangar 4 VNY

Aerolease Group Hangar 4 VNY

Van Nuys, CA

Castle & Cooke Aviation VNY

Castle & Cooke Aviation VNY

Van Nuys, CA

×